• British Columbia
  • Smithers
  • 3627 Hillside Dr

CAD$619,000

CAD$619,000 Asking price
3627 HILLSIDE DRIVE

Smithers, British Columbia, V0J2N0

Delisted

53| 3112 sqft

Listing information last updated on Wed Nov 01 2023 13:53:54 GMT-0400 (Eastern Daylight Time)

Property Map Icon
Open Map

Log in to view more information

Go To Login

Summary

IDR2784717
StatusDelisted
Ownership TypeFreehold
Brokered ByCalderwood Realty Ltd.
TypeResidential House,Detached
AgeConstructed Date: 1968
Land Size14652 sqft
Square Footage3112 sqft
RoomsBed:5,Bath:3
Virtual Tour

Detail

Building
Bathroom Total3
Bedrooms Total5
AppliancesWasher,Dryer,Refrigerator,Stove,Dishwasher
Basement DevelopmentPartially finished
Basement TypeFull (Partially finished)
Constructed Date1968
Construction Style AttachmentDetached
Fireplace PresentTrue
Fireplace Total2
Foundation TypeConcrete Perimeter
Heating FuelElectric
Roof MaterialMembrane
Roof StyleConventional
Size Interior3112 sqft
Stories Total2
TypeHouse
Utility WaterMunicipal water
Land
Size Total14652 sqft
Size Total Text14652 sqft
Acreagefalse
Size Irregular14652
Surrounding
View TypeMountain view
BasementPartially finished,Full (Partially finished)
FireplaceTrue

Remarks

Open Map

Location

Province:
British Columbia
City:
Smithers

Room

Room
Level
Length
Width
Area
Recreational, Games
Bsmt
13.16
27.00
355.23
13 ft ,2 in x 27 ft
Mud
Bsmt
18.24
12.99
237.00
18 ft ,3 in x 13 ft
Bedroom 4
Bsmt
12.66
16.99
215.22
12 ft ,8 in x 17 ft
Bedroom 5
Bsmt
10.07
14.01
141.10
10 ft ,1 in x 14 ft
Workshop
Bsmt
10.99
19.00
208.78
11 ft x 19 ft
Kitchen
Main
12.99
12.99
168.80
13 ft x 13 ft
Eating area
Main
16.08
12.99
208.86
16 ft ,1 in x 13 ft
Living
Main
14.01
19.26
269.80
14 ft x 19 ft ,3 in
Primary Bedroom
Main
14.07
12.66
178.24
14 ft ,1 in x 12 ft ,8 in
Bedroom 2
Main
9.09
13.09
118.97
9 ft ,1 in x 13 ft ,1 in
Bedroom 3
Main
9.09
8.07
73.35
9 ft ,1 in x 8 ft ,1 in