- Ontario
- Brock
15 Nancy Ave
SoldCAD$xxx,xxx
CAD$527,700 Asking price
15 Nancy AvenueBrock, Ontario, L0K1A0
Sold
2110(0+10)| 700-1100 sqft
Listing information last updated on Thu Jun 19 2025 09:40:16 GMT-0400 (Eastern Daylight Time)

Open Map
Log in to view more information
Go To LoginSummary
IDN12198687
StatusSold
Ownership TypeFreehold
Possession30 Days/TBA
Brokered ByRE/MAX COUNTRY LAKES REALTY INC.
TypeResidential Bungalow,House,Detached
Age 51-99
Lot Size100 * 200 Feet
Land Size20000 ft²
Square Footage700-1100 sqft
RoomsBed:2,Kitchen:1,Bath:1
Virtual Tour
Detail
Building
Architectural StyleBungalow
Fireplace FeaturesNatural Gas
FireplaceYes
RoofAsphalt Shingle
Architectural StyleBungalow
FireplaceYes
Property FeaturesBeach,Golf,Lake/Pond,Level,Public Transit,School Bus Route
Rooms Above Grade5
Fireplace FeaturesNatural Gas
RoofAsphalt Shingle
Exterior FeaturesDeck,Lighting,Patio,Landscaped,Privacy,Year Round Living
Heat SourceElectric
Heat TypeBaseboard
WaterWell
Other StructuresFence - Full,Garden Shed,Out Buildings,Workshop
Sewer YNANo
Water YNANo
Telephone YNAYes
Land
Lot ShapeRectangular
Lot Size Range Acres.50-1.99
Parking
Parking FeaturesPrivate Double
Utilities
Electric YNAYes
Surrounding
Community FeaturesSchool Bus
Exterior FeaturesDeck,Lighting,Patio,Landscaped,Privacy,Year Round Living
Other
Interior FeaturesPrimary Bedroom - Main Floor,Sump Pump,Water Heater Owned,Water Treatment
Internet Entire Listing DisplayYes
Security FeaturesCarbon Monoxide Detectors,Smoke Detector
SewerSeptic
Survey TypeNone
BasementCrawl Space
PoolNone
A/CWindow Unit(s)
TVYes
ExposureE
Remarks
The Only Word To Best Describe This Entire Property Is Immaculate! Not A Blade Of Grass Out Of Place As You Pull Into The Large Stone Lined Car Driveway And Take Notice Of The Amazing Curb Appeal, This Home Has Been Completely Redone Over the Years and is Move In Ready for You! Located In A Very Quiet Mature Subdivision in Beaverton's East End on a Large 100 X 200 Pristine Private Lot You'll Find This Cute 2 Bedroom 1 Bath Home Heated Mainly By A Natural Natural Gas Fireplace In The Living Room With Baseboard Backups Open To the Nicely Updated Custom Kitchen With Moveable Island Overlooking The Rear Yard Through Your Sunroom with Large Window, 2 Good Sized Bedrooms & 3 Piece Bath Finish Off This Perfect Starter Home or Down Size & Minimize To Enjoy the Sample Life, 2 Good Sized Sheds In Rear Yard for ALL Your Storage Needs, Fully Fenced Rear Year & Beautiful Mature Trees to Enjoy! Multiple Patios & Rear Deck Offer Plenty Of Outdoor Entertainment Space Plus A Fenced In Vegetable Garden Already Started For you! Heater & Insulated Rear Cubby Houses The Water Tank, Pressure Tank & UV Light With Filter, Enjoy 4 Season Living In Beautiful Up & Coming Beaverton On The Shores of Lake Simcoe & World Renowned Western Sunsets!
The listing data is provided under copyright by the Toronto Real Estate Board.
The listing data is deemed reliable but is not guaranteed accurate by the Toronto Real Estate Board nor RealMaster.
The following "Remarks" is automatically translated by Google Translate. Sellers,Listing agents, RealMaster, Canadian Real Estate Association and relevant Real Estate Boards do not provide any translation version and cannot guarantee the accuracy of the translation. In case of a discrepancy, the English original will prevail.
唯一能完美形容这处物业的词就是——无可挑剔!当您驶入铺砌着石块的宽阔车道时,连一片草叶都整齐有序,令人惊艳的街景立面即刻映入眼帘。这栋住宅历经多年全面翻新,现已达到拎包入住标准!
坐落于Beaverton东端静谧成熟的社区,这块100X200英尺的原始私属地块上,您将发现这栋可爱的两卧一卫住宅。客厅以天然气壁炉为主要供暖源,并配有踢脚线辅助供暖。开放式设计连接着精心升级的定制厨房,可移动中岛正对阳光房的大幅观景窗,将后院景致尽收眼底。两间宽敞卧室与三件套浴室,共同构成了这处完美的首购住宅或精简生活理想居所。
后院配备两座大尺寸储物棚满足收纳需求,全围栏庭院与优美成荫树木相得益彰。多个露台和后院甲板提供了充足的户外娱乐空间,更有已为您规划好的围栏菜园待您耕耘!供暖设备与带绝缘的后方储物间内设有热水箱、压力罐及带过滤器的紫外线净水系统。
在Simcoe湖岸蓬勃发展的美丽Beaverton社区,享受四季分明的湖畔生活,坐拥世界闻名的西部日落胜景!
Location
Province:
Ontario
City:
Brock
Community:
Beaverton
Crossroad:
Nancy Ave and Main St
Room
Room
Level
Length
Width
Area
Primary Bedroom
Main
11.42
9.55
109.00
Bedroom 2
Main
11.48
8.50
97.57
Living Room
Main
17.49
9.81
171.54
Kitchen
Main
11.65
9.78
113.87
Sunroom
Main
11.61
5.87
68.21
School Info
Private SchoolsK-8 Grades Only
Beaver River P.S.
270 King St W, Beaverton1.67 km
ElementaryMiddleEnglish
K-8 Grades Only
Beaver River P.S.
270 King St W, Beaverton1.67 km
ElementaryMiddleEnglish
9-12 Grades Only
Brock High School
R.R. #1 C1590 Conc 12, Cannington11.796 km
SecondaryEnglish
K-8 Grades Only
Holy Family Catholic School
720 Simcoe St, Beaverton1.301 km
ElementaryMiddleEnglish
9-12 Grades Only
Monsignor Paul Dwyer Catholic High School
700 Stevenson Rd N, Oshawa61.71 km
SecondaryEnglish
1-8 Grades Only
Mccaskill's Mills Public School
85 Albert St, Cannington12.433 km
ElementaryMiddleFrench Immersion Program
9-12 Grades Only
Port Perry High School
160 Rosa St, Port Perry39.971 km
SecondaryFrench Immersion Program
1-8 Grades Only
St. Joseph Catholic School (uxbridge)
25 Quaker Village Dr, Uxbridge36.735 km
ElementaryMiddleFrench Immersion Program
9-9 Grades Only
Monsignor Paul Dwyer Catholic High School
700 Stevenson Rd N, Oshawa61.71 km
MiddleFrench Immersion Program
10-12 Grades Only
Father Leo J. Austin Catholic Secondary School
1020 Dryden Blvd, Whitby60.57 km
SecondaryFrench Immersion Program

























